Project maintenance requirements Machine appearance Clean the fuselage surface and dead ends, requiring no oil machine yellow robe; cleaning screw, light rod, slide the sliding parts, fill the missing parts, rail surface clean without burrs, the operation of flexible, reliable positioning ; Repair the slip of the parts of the serious pull, research, bruises; appropriate filling lubricants. Check the contactor, relays, solenoid valves, proximity switches, limit switch performance is good, reliable action; check the contact with the circuit, the circuit, the circuit, Operation panel, monitor, button, indicating light instrument performance; machine ground firmly, to meet the requirements; adjust the oscillation barrel, vibration, slide down without jamming phenomenon. Lubrication of the operator using the oil tankers, oil guns should be complete, clean and complete operation of the operator should be daily lubrication chart, according to the amount of fuel lubrication on the surface of the guide surface should be done as required lubrication oil hole, oil nozzle should be clean, , No damage to the oil line, linoleum should be on time first, no hard failure phenomenon Mechanical transmission part of the spindle bearings are checked whether the flexibility, cam wear, repair and replacement of abnormal parts and filling grease; chain and sprocket wear: check the chain The tightness of the belt, if not appropriate to be adjusted, the chain is dry, if the need for fuel maintenance; check the belt tightness: the hand in the middle of the belt to apply about 2kg vertical pressure, such as the amount of sink is 20-30MM appropriate, inappropriate Adjust the installation of the pulley, the two pulley centerline to be aligned, otherwise it will cause the belt unilateral work, wear a serious reduction in belt life; not allowed to mix old or reduce the number of use.